Hi Team,
I am doing EP SP13 upgrade(Netweaver 7.4). But, it got stuck in configuration phase. Also, server0 is also stopped for EP.
Now, I am not able to start server0. There is no specific error found in work dir.
Tried to restart it manually, It tried to restart 4 times then failed. ICM is up and running.
jvm_bootstrap.out log
Default logs
Please suggest, how to start server0.
With Regards,
Shyam